 |
|
|
|
|
Listed below are a selection of Case
Studies. Please click on each Case Study
for further details:
|
|
ELS worked with the Civil & Structural
Design Engineers to include tender specification
requirements for waste management (including
hazardous wastes) and environmental planning
& control measures in order to minimise
potential damage to sensitive receptors.
Environmental consultancy services were
also provided during the Construction Stage.
View
Full Case Study
|
|
On behalf of the appointed Contractor,
ELS classified material based upon accepted
and legislated waste criteria in accordance
with the European Waste Catalogue (EWC)
and Hazardous Waste List. We also provided
interpretation of vertical and horizontal
spatial distribution of the soil waste material.
View
Full Case Study
|
|
ELS undertook a subsurface investigation
of land proposed for a bridge replacement
and road realignment scheme. The scope of
work included tasks at the tender, pre-construction
and construction stages.
View
Full Case Study
|
|
A Contaminated Land Guidance Document was
prepared by ELS on behalf of a government
regulatory body.
View
Full Case Study
|
|
ELS prepared an EMP and supporting documentation
to assist with surface water protection,
pollution incident control, waste management,
and compliance with National and EU legislation.
View
Full Case Study
|
|
ELS was responsible for undertaking an
environmental assessment of a River/Lake
system impacted by gas oil diesel. The investigation
included surface water, riverbank and river-bottom
sediments.
View
Full Case Study
|
|
ELS assists the Comite Europeen des Assurances
- Insurers of Europe (CEA), to enhance the
development of sustainable insurance solutions
for prevention an remedying of environmental
damage with particular emphasis on the Environmental
Liability Directive (2004/35/EC).
View
Full Case Study
|
|
ELS investigated site soil, groundwater
and soil gas conditions at a Pharmaceutical
site. Further, we assisted with the site
risk assessment and evaluation of viable
options for site remediation and development.
View
Full Case Study
|
|
ELS' provided environmental consultancy
services, in connection with the characterisation
of landfill waste material.
View
Full Case Study
|
|
ELS have completed subsurface investigations
at petroleum service stations and fuel depots
located across Ireland on behalf of the
petrochemical industry.
View
Full Case Study
|
|
ELS have provided environmental expertise
on behalf of loss adjusters, home-owners
and solicitors on a significant number of
residential oil spills located throughout
the country.
View
Full Case Study
|
|
ELS undertook a review and audit of an
organisations environmental performance
within the ISO14000 structured management
system.
View
Full Case Study
|
|
ELS offer the capability to evaluate Light,
(Lux) requirements for various work and
associated support areas.
View
Full Case Study
|
|
ELS can provide recommendations on heating
system efficiencies using various fuel types,
(oil, heavy fuel oil, natural gas, electricity,
biomass).
View
Full Case Study
|
|
Electrical energy management services provided
by ELS include a full examination of our
clients electrical bill and an assessment
of how best to manage the various tariff's
imposed by the energy provider.
View
Full Case Study
|
|
ELS can undertake an energy assessment
of individual items of plant leading to
tailored energy management solutions.
View
Full Case Study
|
|
The Broadmeadow Viaduct is located within
a Special Protection Area (SPA) and a Special
Conservation Area (SAC), both which are
Natura 2000 sites. The sites are furthermore
protected under national legislation as
proposed Natural Heritage Areas (pNHAs).
View
Full Case Study
|
|
ELS undertook a hydrogeological assessment
in relation to the proposed installation
& operation of a groundwater abstraction
well for the Aldi Distribution Centre, Mitchelstown,
Co. Cork.
View
Full Case Study
|
|
On behalf of a leading commercial lines
international insurer, ELS prepared a specialised
environmental insurance underwriting guideline
in connection with non-pollution environmental
damage exposure risks that fall within the
scope of the Environmental Liability Directive
(ELD) 2004/35/EC.
View
Full Case Study
|
|
A spillage of approximately 650 litres
of hydrochloric acid (36%) occurred at our
Client's manufacturing site. The date of
the spillage was subsequent to 1 April 2009
transposition date of the Environmental
Liability Directive (ELD) 2004/35/EC.
View
Full Case Study
|
|
|
|
 |
|
|